2019
• Complete paint job
MAIN SALON/DINING SALON
• New overheads installed
• Main salon aft worktops resurfaced
• Marble floor put down aft of main salon
• New stone (marble) installed on outer shelves of main salon and dining
• New furniture and soft goods throughout
• New TV installed
• New wallcovering in main salon and dining
• New wool and dull silk carpets installed in main salon and dining area
• Various artwork and ornaments replaced
• AV system has been updated and some new iPads
MAIN DECK CORRIDOR
• New marble flooring as well as new artwork installed
MASTER STATEROOM
• New overheads installed made Vinyl
• Master office leather floor has been taken up and carpets have been put down
• throughout the offices and master stateroom
• New furniture and soft goods in master stateroom and study
• TV replaced in Master office, AV system updated and trim around TV replaced
• Artwork/ornaments updated
• New master stateroom chandelier installed with various glass slates and new wall
• sconces installed around master cabin
GYM
• New overheads installed made from Vinyl
• New carpet installed matching the master cabin
• New drapes installed
• New wall Panels installed in room
• New glass panels installed in gym shower and new faucets being installed on sink
SKYLOUNGE
• New overheads installed
• New carpet has been installed
• New skylounge bar top has been installed
• Sconces replaced throughout the skylounge
• LED strip lights updated and added in areas of the skylounge
• New furniture and soft goods
• Wooden walls in skylounge have now been replaced with white wallcovering
• 2 brand new TVs installed
• Various nesting updated inside cupboards to accommodate new glassware
• New decorative pillows and cashmere blankets for skylounge as well as updated artwork around the room
SKYLOUNGE DAYHEAD AND STAIRCASES
• New Vinyl overheads in skylounge dayhead
• Skylounge dayhead floor has been replaced with marble, sink worktop replaced with marble and new faucets installed around the sink area
• Stair Wall Panel Fabric installed (whisper walls)
• Skylounge leather railing installed made from 100% leather
• Carpet installed on both guest staircases
GUEST STATEROOMS
• New carpets installed in all lower guest staterooms
• Each bedroom has new headboard panels
• New shelving panels installed
• New blinds installed, roman shades
• New decorative pillows, cashmere blankets, ornaments, and artwork through guest staterooms
• New bed linen updated throughout each guest cabin
• Updated AV system in all cabins
• New wall covering installed in each guest stateroom bathroom
• All faucets replaced with new ones in each guest stateroom
GUEST STUDY
• Various new furniture
• New carpet installed
• Brand new TV installed in study with new wall panels
• AV updated in study
• New speakers replaced in study
ENGINEER REFIT LIST
HULL
• zinc anodes Inspected and replaced
FRESH WATER SYSTEM
• Replaced all four Domestic Boilers
TANKS
• Inspected and cleaned
VENTILATION
Engine Room Ventilation System:
• Port & Stbd Fire Dampers Replaced with new
• Port Supply Fan Replaced with new
• Stbd Exhaust Fan Replaced with new
• All four Internal Fan Motors on Central Circulation System has been replaced with new
Galley Fan System:
• Supply Fan Replaced with new
• Exhaust Fan Replaced with new
SHIP VALVES
• All 42 Though-Hull Valves has been removed For ABS inspection
• Pressure Tested 5 New Type Approved Through-Hull Valves
• Install All Through-Hull Valves and Pressure Tested After Installed
• ABS Inspected All Through-Hull Pipes
• Replaced Stbd A/C Sea Water Outlet Through-Hull Pipe
• Replaced Stbd Generator Spray Ring By-Pass Through-Hull Pipe
• Replaced Stbd Sea Chest Through-Hull Pipe
• Repaired Port Sea Chest Through-Hull Pipes With Valves Closed
• Repaired Broken Galley Drain Grey Water Pipe Located Between Guest Study & Port Twin
• Pressure Test All Through-Hull Valves In Place
PUMPS
• Various have been removed of the vessel, inspected, repaired or replaced.
BOW THRUSTER
• Removed for inspection and seal replacement
PROPS & SHAFTS
• Port & Stbd Prop Shaft Wartsila Seals Replaced
• New port and stbd Stern Tube fwd bearing carrier with stainless steel has been fabricated and ABS approved
• port & stbd P-Struts repaired with Belzona, ABS approved
GEAR BOXES:
• both have been removed of the vessel and send over to Reintjes for 10 year Major Service
• Port & Stbd Vulkan Couplings has been serviced
STEERING SYSTEM
• emergency steering header tank oil replaced
• Filter elements and seals replaced
• port and stbd Rudders removed, bushing and seal replaced, shaft alignment checked, rudders pressure tested, hydraulic rams removed and serviced, hose fitting replaced
MAIN ENGINES
• all engine vibration mounts replaced
GENERATORS PORT & STBD
• sea water pipes replaced
• aft crankcase seals on both engines replaced
• injector wiring harness on both engines replaced with a CAT upgraded ones
• power unit space heaters installed
BATTERIES
• Replaced all fire door batteries
• Replaced all water tight doors batteries
• All four Main Engines starter batteries replaced
WINDLASS
• Both port & stbd units serviced and new seals installed
VSAT & TVRO
• Install new Italian
• Completed 10 years inspection and service
AIR COMPRESSED SYSTEM:
• Replaced both air compressors with new
• Replace service reservoir relief valve located in the bridge
• Borescoped all 3 air reservoirs
OWS
• Opened, cleaned, Monitor Calibrated and inspected by ABS & Flag surveys
BILGES
• Cleaned and painted all bilges
GALLEY OVEN MODIFICATION:
• Fabricated a new island and installed 2 new MKN ovens and ice maker
DIESEL PURIFIER
• Carried out major, intermediate, oil change, clutch pads and bearings replacement
LOAD BANK
• Replaced all gaskets, including element gaskets and pipe fitting gaskets and replaced pump end
2018
STABILIZER SYSTEM
• Port & Stbd fins removed
• Upper and lower seals replaced
• Shaft, roller & hull sleeve bearings on Port & Stbd sides replaced
• All cylinder spherical bearings replaced
• Replaced all accumulator bladders and filling valves
• Replaced all o-rings on hydraulic distribution block solenoid valve
BOW THRUSTER
• All bearings replaced
STERN THRUSTER:
• Thruster leg replaced with brand new unit
• Shaft Seals replaced
• Electrical Motor removed and serviced including megger testing
2017
MAIN ENGINES - Painted both engines after below service.
• PORT - Top End 9000 hr service completed
• Replaced all exhaust gaskets & insulation
• Replaced sea water flex couplings
• Removed and serviced both Starters Motors
• STBD - Top End 9000 hr service completed
• Replaced all exhaust gaskets & insulation
• Alternator pulley and belt checked
• ET Full Check
• Removed and serviced both Starters Motors
GENERATORS
• PORT - Major Overhaul Carried out
• STBD - Major Overhaul Carried out
EMERGENCY GEN
• Replaced four starter batteries with new
PTO UNITS
• Rexroth hydraulic motor removed for servicing and testing, unit installed and tested
• PTO pumps removed and inspected, new seals & gaskets installed, units tested
• Hydraulic hoses on PTO units replaced
STABILIZER SYSTEM - PTO pump suppressors rebuild
A/C SYSTEM
• Rebuild both 1 & 2 sea water pumps
• Rebuild both 1 & 2 chiller pumps
2016
PORT & STBD GENERATOR
• Installed larger fuel booster pump on both Gens
• Woodward EasyGen PT Isolation Installation carried out
• Installed new block heat sensors on both Gens
• Install Fuel Restriction gauges after Racor Filter
LOAD BANK
• Replaced all heater elements, pressure sensor and flow sensor
• Replaced all seals on housing
• Installed new cooling water pump & motor
MOORING/WINDLASS
• Entire aft capstans removed for full service
• Windlass hydraulic pump & gearbox overhauled
• Gypsy bushings replaced
• Adaptors and hydraulic hoses replaced
BATTERIES
• Master & Slave Transas Memory Battery replaced
• Replaced Port Engine Room Battery Bank batteries x 4
• Replaced Stbd Engine Room Battery Bank batteries x 4
LAZ (TRANSOM) DOOR
• Removed all locking pins and seals replaced
FRESH WATER SYSTEM
• All boiler elements replaced
• Replaced all boilers safety valves
2015
DIESEL PURIFIER
• Installed a float switch in drain tank
• Carried out a major service
• Carried out an intermediate service
MOORING/WINDLASS
• Windlass brake pad removed and replaced with riveted type
• All windlass bushings replaced
• Windless drive unit removed and full service carried out
QUATUM HYDRAULIC SYSTEM
• 3x solenoid valves on power pack replaced
• All suppressors and accumulators replaced
• Inboard sea water cooling pump replaced
These particulars have been prepared by us from information provided by the sellers and are intended as a general guide to the vessel. We cannot, however, be liable for any inaccuracy. It is up to the purchaser to confirm details of concern to him by survey, inspection and/or enquiry of the seller and to ensure that the purchase contract properly reflects his concern and specific details upon which he may rely. We always advise an independent survey.