LANGKAWI LADY - 1983 157' 6" STERLING YACHTS Canoe stern
Langkawi Malaysia $3,800,000 USD
Langkawi Malaysia
FULL SPECIFICATIONS
SPECIFICATIONS:
MAIN CHARACTERISTICS |
LOA 48M 157’06”
Beam 8.66M 28’05”
Draft 3.29M 10’10”
Builder Sterling
Year Built/Refit 1983 / 2006
Hull Carbon Fibre Reinforced Alloy
Superstructure Fibre glass
Flag St Vincent and the Grenadines
Classification ABS
Speed (max/cruise) 14 / 10 knots
Gross Tonnage 540 tonnes
Net Tonnage 162 tonnes
Range 4,000nm approx.
Guest Accommodation 18 guests in 8 cabins
Crew Accommodation 15 crew members
MAIN MACHINERY |
Main Engines 2 x Caterpillar 3512TA V12 775KW Diesels
Generators 2 x Caterpillar 3406T 225HP Diesels
415 V 3 Phase
220 V Single Phase
Stabilizers Naiad Anti-Roll Model 525
Water makers Sea Recovery (2 units) 5,300L & 6,814L per day
Navigation Electronics Furuno
Bow Thrusters Side power
Auto Pilot, Furuno Radar, AIS, Magnetic Compass, Gyro Compass, VHF Radio,
Chart Plotter, GPS and Echo Sounder.
CAPACITY |
Fuel 83,000 Litres
Fresh Water 35,000 Litres
Water maker 12,000 Litres/Day
ACCOMMODATION |
MAIN DECK
Main Saloon, Bar Counter, Dining Area, Main Galley
Master Stateroom and VIP Room, both with Ensuite Bathrooms
LOWER DECK
Six Guest Rooms
2 Nos. Double Bedroom
2 Nos. Twin Bedroom
2 Nos. Triple Bedroom
All with Ensuite Bathrooms
UPPER DECK
Wheelhouse, Chart Room and Study Room
SUN DECK
Helipad, 2 Nos Davit, Tenders and Jet Ski
ENTERTAINMENT EQUIPMENT |
Seatel Antenna - Astro
Computerised Karaoke Sound System
MP3 Music System
DECK & SAFETY EQUIPMENT |
4 Nos Life Raft, Lift Buoys, Fire Extinguishers, EPIRB, EEBD, Fire Sprinklers, Portable Water Pump c/w Fire Hose etc.
GALLEY LAUNDRY |
Fridge, Freezer and Cold Room
Washing Machines and Dryer
TENDERS & TOYS |
Boston Whaler Fibre Glass Speed Boat (21 feet) with 200 HP 4 Stroke Engine
Nouvurania Speed Boat (RIB) with 115HP 4 Stroke Engine
Yamaha Jet Ski - Wave Runner XL 700
WORKS/REFITS |
Stabilizers
- New Naiad stabilisers was installed in October 2010.
- Model: Naiad 525 – anti roll stabilisers system with 2 new fins.
- Service and maintenance parts replaced in March 2014:
- Suction Filter Element.
- Press Filter Element.
- Cylinder Rod Seals Kit.
- Reservoir Zinc Anode.
- Case Drain Zinc Anode.
- Piston Pump.
Main Engines
- Two main engines overhauled in March 2010.
- Inspection done in June 2011.
- Service and maintenance in 2015.
- ABS Bangkok – survey done on 28 Sep 2015.
Generators
- Major overhauled Port & Starboard Generators (engines + alternators) – May 2015.
- Overhauled and Calibration of alternator engine ‘Woodward’ governors.
- Overhauled Port & Starboard transmission gear.
- Repair and Service Port & Starboard heat exchanger.
Interior
- Upgrading works were done from time to time when necessary.
- Upgrade of 6 nos. Guest Rooms were done in Oct – Nov 2015.
- Painting of Cabinet, beds, doors and wardrobes.
- Replaced wallpaper and curtains.
- Replaced wallpaper at the corridor – lower deck.
- Replaced Roman Blinds for Main Saloon, Dining Area, Study Room and two Staterooms.
- Replaced carpet in the Study Room.
- Upgrading works were done on the Air –Conditioning System.