12 guests in 5 cabins
1 Double bed in Owner’s Cabin + bathroom with Steam room
1 Double bed in Guests Cabin + Bathroom
2 Twin beds in each 3 Guests Cabin + Pullman beds in each cabin + Bathroom in each cabin
Crew Accommodations:
3 Cabins with 2 Pullman beds each + bathroom in each cabin
1 Pullman bed in Laundry
Owners cabin with an ensuite 'his and hers' bathroom, 2 convertible beds; it is possible to convert this cabin into two seperate cabins by sliding an automatic partition.
Three guest cabins all with ensuite bathrooms (3 twins one with Pullman berth)
Two crew cabins with ensuite bathrooms and 2 berths (Twin)
One Captain cabin with en suite bathroom and 2 berths (Twin)
Year 2011- ABS Inspection:
Checked fresh water tanks
Checked Fuel tanks
Checked Main Engine (report of works carried out as per maintenance program from Manufacture)
Checked Generators (report of works carried out as per maintenance program from Manufacture)
Checked Shaft and Propellers alignment
Checked Skeg bearing and pumps
Checked all Hull valves
Checked all Communication Equipments (VHF, AIS, GMDSS, Navtex, Portable GMDSS VHF)
Checked Fire Fighting System (Pumps, Fire Equipments, Breathing Device, Pipe, Hoses, etc...)
Checked CO2 installation
Checked Smoke Detector System
Checked bilge, bilges alarms, bilge pumps
Checked Chain locker, Anchors and chains
Update of all ABS Certificates
Year 2014:
Service on Tender Engine
Replaced rubber tubular on Tender
Revised Electrical plants on Tender
Year 2015:
Hull, superstructure, Mast and boom repainted
Botton entirily sandblasted
Rigging completely revised and same parts replaced
Replaced all superstructure windows (Main saloon, Wheelhouse and Fly)
New Staysail (ONESAIL manufacturer)
Year 2016:
ABS Special Survey 10 years (Revised Shaft, all tanks checked, Ecosound on hull)
Reseal Main Deck with new Polymer and Sanding Teak
Upgrade of A/C Control Panel
Revised A/C pumps
Year 2017:
Replaced Main Engine Control/Monitoring Panel on Wheelhouse
Replaced pipes keel
Yearly:
Winches and Anchor windlass maintenance
Service Main Engine as per Maintenance program
Service Generators as per Maintenance program
Painting by Varnish the gunwale (3 times per year)
Bow & Stern Thruster : Extractible Hundested A/S mod. FT 2½ R 75 HP
Fuel Separator: 220V Alfa Laval MAB 103 centrifugal fuel separator of approx
500liters /hr, Separated electro pump
Fuel oil transfer pump: 1 Gianneschi & Ramacciotti
Fuel oil Centrifugate pump: 1 Alfa Laval MAB 103B-24
Fuel oil primary filters: Facet model VFCS 21/C-PG
Lube oil pump: 1 Gianneschi & Ramacciotti
Oil Water separator: Facet model CPS 1,6 E
Water Boiler: 2 x Gianneschi 200 liters 5 kW with
Fresh water pump: 2 x Gianneschi & Ramacciotti each 70 l / m
Hot water Circulating pump: Gianneschi & Ramacciotti CB-CG
Water makers: 2 x Idromar MC5S each 5500 per day (total 11,000 liters per day)
Marine Toilette: 10 Jet Marine WC
Waste treatment system: Hamman treatment system
Primary Bilge Pump: 1 Gianneschi ACM-BT 220/380 l/m 4 kW
Secondary bilge pump: 7 Gianneschi & Ramacciotti MINI MAXI SUB VORTEX 1 for each compartment
Fire pump: 1 Gianneschi & Ramacciotti ACM-BT 220/380 l/m 4 kW